Recent Question/Assignment

The project definition, assignments as well as installation procedure is as attached in this mail.

Assignments 1 to 5 are secured; however, what remains is Assignment 6 which requires the coding to be completed in NetBEANS IDE.

First and foremost requirement is to ensure that the installation is done properly.

Irrespective of version of Java SDK and JRE, the IDE environment and version should ONLY and STRICTLY be NetBeans 7.3.1

The UML Class, Sequence Diagrams etc, can be drawn in preferably NetBeans UML, if it is not convenient on that, any other UML tool would do,

Tasks have been logged on to ZohoProjects, which can be added/edited/deleted on from the below mentioned credentials on zoho projects portal

Username: **************************
Password: **************************

Assignment 6 is in continuation to Assignment 3 as you can read in the project specifications. So, half of your work in Assignment 6 is already done. What needs to be completed is, attachment of the code, and also the documentation that would remain in Assignment 3 section which you can go through the attached files herewith.

I shall also send you further details on what all needs to be done in Assignment 6 which I omitted to submit in Assignment 3, i.e. mainly the last section of new Class diagrams etc.

Apart from that, the assignment is pretty simple for a professional Java developer; I am just lacking time due to other commitments out here.

It is not necessary to stay within the box, any new innovativeness you would like to implement in the project would be really good, if not, the basic requirements should definitely be met.

MOST IMPORTANTLY: It is very important for me to know if you can have the environment setup, as a handful of developers were unsuccessful on having the environment setup on their systems.

Another factor, I will need the assignments submitted to be in Word Format as well as the code so that I can make a successful submission here. At least a day in advance if you submit me the assignment, it will help me submit in the required style here as well as help me be prepared for any counter questions by the professor.

Best luck and would love to hear back from you on, if you can do it, and also, on the time frame and cost.

Regards,
****

Deadline: 4th November, 2013 - Monday

Assignment 6 Specifications and Project Specifications have been attached separately.